Deferred maintenance is frequently presented as an engineering backlog. IFMA's 2025 knowledge publication frames it more broadly—as a business risk affecting operations, finance, safety and resilience.[12] That framing is strategically useful even where the public page does not provide a quantitative methodology.
Analysis
The accounting temptation is to count a delayed task as a saving. In reality, the organisation exchanges a known intervention for an uncertain liability: higher failure probability, shorter asset life, service disruption, safety exposure, energy waste or a more expensive emergency response. The effects can compound when ageing systems interact.
Osmos Global analysis: maintenance prioritisation should combine condition with consequence. A low-cost failure affecting a critical process can outrank a costly but redundant asset. The core register should show asset criticality, failure mode, condition confidence, statutory duty, operational consequence, interim control and latest safe intervention date.
Boards and CFOs need a translated view. Report backlog by risk tier, not only currency. Show changes in critical exposure, repeat failures, emergency-to-planned work, downtime and energy penalty. Distinguish incomplete records from healthy assets; missing condition data is uncertainty, not evidence of low risk.
The decision is not whether to eliminate every backlog. It is whether the organisation understands the risk it is carrying, has accepted it at the right level and has a funded path for the exposures that matter most.
Decision lens
Recommended action. Present deferred maintenance to executives by consequence and risk tier, not backlog value alone.
Evidence basis: IFMA deferred maintenance 2025; JLL Global State of FM 2025. Public-page limitations apply where full reports are restricted. Rights:
Original Osmos Global analysis; no third-party visual or protected table reproduced. Confirm licence status before publication.
Cite this
Osmos Global Research & Knowledge Centre (2026). Deferred Maintenance Is Enterprise Risk. Osmos Perspective, Osmos Global. https://www.osmosglobal.org/articles/deferred-maintenance-is-enterprise-risk
Keep reading

Smart-Building Pilots Need an Operating Owner
An experiment becomes useful only when someone owns the decision it is meant to improve.
1 Sept 2026 · Osmos Global Research & Knowledge Centre · 5 min read

An Alert Is Not a Maintenance Outcome
Analytics creates value through verified correction, not the number of faults displayed.
1 Sept 2026 · Osmos Global Research & Knowledge Centre · 5 min read

Sensor Coverage Is Not Data Quality
Connected points need identities, context and a known level of trust before they can support decisions.
1 Sept 2026 · Osmos Global Research & Knowledge Centre · 5 min read
Download this paper
The full PDF, formatted for circulation. Downloads are for members, so that we know who our research reaches.
Discussion
Add what you are seeing on the ground.